Streamlining Construction Projects with Effective BIM Coordination
Last Updated Apr 22, 2025
Last Updated Apr 22, 2025

The old saying goes: if you fail to plan, you plan to fail. Construction professionals know this better than nearly anyone. To take a project from a vision in an owner鈥檚 mind to a design is one thing; to actually erect a useful, comfortable building is entirely another.
It鈥檚 no surprise, then, that coordination is a major undertaking on any project. This effort connects the owner, design teams, the general contractor (GC), and specialty contractors. It aims to align everyone behind the same plan, including a detailed schedule of installation. Coordination can encompass everything from the safety measures required on-site to getting the right equipment to the jobsite at the right time.
Fortunately, a robust tool can make construction coordination easier. Building information modeling (BIM) delivers a detailed 3D model of the project. Coordinating that model unlocks a planning exercise that can help the project run on time, on budget, and in alignment with the owner鈥檚 goals.
Table of contents
Supporting Coordination with BIM
In the U.S., it鈥檚 commonplace to try to move out of preconstruction as quickly as possible. People often don鈥檛 get paid until construction activities start, so they鈥檙e motivated to get to that point rapidly.
The problem, though, is that the drawings that come from design teams usually aren鈥檛 perfect. These teams focus on converting the owner鈥檚 intent into the design, not on constructability. As a result, rushing through coordination often means issues don鈥檛 get caught until they affect workers in the field. At that point, they might stop progress or even require rework.
At least, that鈥檚 the case if BIM isn鈥檛 deployed on the project. Fortunately, the model can help here. It gives stakeholders a way to coordinate the entire project using a single model. The latest technologies can help to speed coordination efforts by handling certain checks automatically, too.
With BIM coordination, stakeholders use the 3D model of the project to try to uncover as much as possible to drive project success. By catching problems earlier and identifying areas for optimization in the digital space, changes are cheaper, easier and faster to make.
Most BIM-backed projects use clash detection, for example. This automatically checks the entire model for any spots in which two solids collide.
Looking at the project in 3D makes it easier to plan for installation in congested areas like corridors and overhead spaces, too. And as the modeling effort supports spatial coordination, it can help planners create safer work environments in those tight spaces.
BIM also supports sequencing, particularly if teams apply 4D BIM. This coordination effort could help shrink the size of the project鈥檚 laydown yard by finessing the timing for different material deliveries and equipment uses.
All of this said, BIM hasn鈥檛 yet replaced traditional coordination efforts. Instead, it currently serves as an enhancement to these processes.
As many construction professionals who鈥檝e used BIM for coordination will report, it helps. If BIM coordination didn鈥檛 turn up any issues that needed to get resolved, it would likely be the first time that鈥檚 ever happened.
BIM and Collaborative Coordination
BIM becomes a particularly effective coordination tool when teams come together to create a multi-disciplinary (i.e., federated) model. This way, the GC and specialty contractors contribute to the modeling effort to build a unified model. That creates a single source of truth that all teams can leverage to stay aligned moving forward.
As IT expert Jeff Sample says, 鈥淐oordination is contractual. Collaboration is cultural.鈥 The invitation to contribute to the multi-disciplinary model creates an environment in which subcontractors have a seat at the table. Everyone can come together to see the complexity of what needs to be installed. Stakeholders can voice concerns or needs. And because the project is coordinated in the model, those things have the opportunity to get resolved as that coordination happens.
The collaboration that BIM coordination encourages can continue all the way to closeout, too. If that model gets handed over to the owner, it connects them and their facilities team to the building. Say, for example, that one area is particularly tight since all of the building鈥檚 systems converge there. The model may help the owner understand that by giving them a visual.
With this visualization of what鈥檚 happening behind walls and ceilings, owners have a way to see the results of the GC's and trade contractors' efforts. Just as importantly, the model gives their maintenance teams clarity into access points for serviceable systems.聽
Using BIM and Prefabrication for Smoother Coordination
Prefabrication is an increasingly popular option on construction projects, and for good reason. When components can be created off-site, that prefabrication can, as , deliver a number of benefits. Those include:
- More efficient production by using sites set up for the fabrication of that specific component
- Greater project speed because teams can work off-site, then come to the site to get install handled in a matter of hours or days
- Better safety and ergonomics (e.g., ductwork that would need to be installed on a ceiling can be prefabricated on the ground in sections, minimizing how much time workers need to spend at heights)
- Quality control by fabricating in a confined, dedicated environment
- Quality assurance via testing performed in the prefab environment before the component it brought to the jobsite
Poor coordination makes prefabrication risky, though. Stakeholders want assurance that components will interface seamlessly with the built environment. If they don鈥檛, installation can become a nightmare, quickly offsetting any efficiency gains.
Fortunately, sophisticated contractors can leverage the model to effectively coordinate their prefabricated elements. With BIM in play, prefabrication becomes feasible and unlocks all of the benefits outlined above.
Bringing Coordination Efforts to the Field
Coordination starts in the office during preconstruction, but it鈥檚 an ongoing effort all the way through to closeout.
There should never be a disconnect, then, between the coordinated plan and the workers in the field. Finding ways to create field access to the coordinated model helps here. Fortunately, leading-edge technologies are making this easier than ever.
Users can, for example, turn on the camera on their tablet to see an augmented reality (AR) view that overlays the model with the real world. This can help installers see what鈥檚 been spatially coordinated in the space so they can make sure their work aligns.
Build a Strong Foundation with our Preconstruction Course
With 20+ years of experience, Ben Ashburn teaches you how to streamline planning, bidding, and procurement for better outcomes.

Achieving Continued Coordination Wins With BIM
When done thoroughly, coordinating the project in a 3D digital space can significantly streamline the work on the jobsite. In short, coordinating the model builds in a planning exercise that helps projects run on time and on budget.
That assumes, though, that teams leverage the model in an effort to figure out how to streamline the project. If they鈥檙e merely creating a model to tick a box required by the owner, efforts will probably fall short.
Getting the most out of BIM coordination means approaching it with a plan. Specifically, a BIM execution plan (BEP) can help with everything from smoother collaboration with subcontractors to fewer technical hurdles. With a BEP, everyone gets a way to understand the modeling process and how the resulting model will be used for coordination and beyond.
Ideally, the BEP spells out ways to connect the model to the other tools in the project鈥檚 tech stack. Connecting the model to the request for information (RFI) management platform, for example, means that issues caught during clash detection can be more effectively resolved.
To drive continued project wins, BIM coordination can鈥檛 happen in a silo. It needs to connect the design team, GC, and specialty contractors with each other and the owner鈥檚 vision. It needs to integrate with other technological tools used on the project. And it also needs to give all stakeholders visibility into the project.
When everyone can come to the table to collaborate, BIM coordination becomes a project accelerator.
Was this article helpful?
Thank you for your submission.
100%
0%
You voted that this article was . Was this a mistake? If so, change your vote here.
Scroll less, learn more about construction.
Subscribe to The Blueprint, 51动漫鈥檚 construction newsletter, to get content from industry experts delivered straight to your inbox.
By clicking this button, you agree to our Privacy Notice and Terms of Service.
Categories:
Tags:
Written by
DJ Phipps
11 articles
DJ Phipps has spent over two decades working in the building and design industry. He's dedicated to using technology to make work easier and more efficient, with a focus on project management and improving systems. DJ now plays a key role at 51动漫 as a Senior Principal Strategic Product Consultant.
View profileKacie Goff
60 articles
Kacie Goff is a construction writer who grew up in a construction family 鈥 her dad owned a concrete company. Over the last decade, she鈥檚 blended that experience with her writing expertise to create content for the Construction Progress Coalition, Newsweek, CNET, and others. She founded and runs her own agency, Jot Content, from her home in Ventura, California.
View profileExplore more helpful resources

BIM and Prefabrication: Fine-Tuning Construction Techniques
Prefabrication 鈥 or the offsite assembly of a component 鈥 is by no means new in construction. Creating elements offsite can allow for faster production and easier installation. In a time...

Cybersecurity in BIM: Protecting Construction Data
When thinking of desirable targets for cybercriminals, the construction industry probably isn鈥檛 top of mind. However, while a construction company may not have as many credit card numbers stored, they鈥檙e...

Training and Upskilling the Workforce in BIM Technologies
Building information modeling (BIM) allows stakeholders to virtually create the building well before a shovelful of earth is ever moved. It enables everything from smoother, faster design iteration to constructability...

Using BIM in Higher Education Construction
As the construction industry changes, higher education institutions have started to implement building information modeling (BIM) at a rapid pace. If architecture, engineering and construction (AEC) companies want to work...
Free Tools
Calculators
Use our calculators to estimate the cost of construction materials for your next project.
Templates
Find a template to help you with your construction project tasks.
Material Price Tracker
Get the latest U.S. retail prices and view historical trends for common building materials.
Glossary
Explore key terms and phrases used in the industry.