51动漫

51动漫 Company Logo
    • Asia Pacific
    • Australia (English)
    • Singapore (English)
Request a DemoRequest a Demo
Request a Demo

鈥斅犅4 min read

RFQs Explained: How Contractors Prove Their Qualifications

叠测听

Last Updated Nov 5, 2024

By

Last Updated Nov 5, 2024

Illustration of a construction RFQ document

In the construction industry, the term RFQ can mean two very different things: a request for qualifications, or a request for quote. 

When an owner-developer uses a request for qualifications (RFQ), they do so to narrow down the list of contractors, to those who best meet the criteria for a specific project. However, when a head contractor uses a request for quote (RFQ), they do so during the variation process (the act of altering the original construction contract) to determine the exact cost of a required change to time, money or scope/the initial scoping process.

Between the two above-mentioned definitions, a request for quote (RFQ) is common in financial management software; specifically, to manage the variation process, which allows a head contractor to respond to a pricing request from an owner-developer and a subcontractor to respond to a pricing request from a head contractor. Some contractors don鈥檛 use this formal term at all, simply referring to it as 鈥済etting pricing.鈥

In this article, you鈥檒l learn more about requests for qualifications: How RFQs are used, what to include in an RFQ, and how RFQs compare to other construction requests.

Table of contents

What is a Request for Qualifications?

Owner-developers use a request for qualifications (RFQ) to prequalify a shortlist of potential contractors for a specific project.

Owner-developers use a competitive tendering or proposal process to try to secure the best price for a project. That said, owner-developers also need to ensure that the contractors they partner with have the right experience, and the right team, to complete the project. For this reason, many owner-developers 鈥 on both public and private projects 鈥 use RFQs to narrow down a list of potential contractors. This way, only qualified contractors have a chance to be awarded the project.

Contractors respond to RFQs with a statement of qualifications (SOQ), which enables owner-developers to determine which contractor meet the necessary criteria to successfully complete a project.

An RFQ is often the first step in multi-stage procurement. In the second step, owner-developers may then issue a request for proposal (RFP) to qualified contractors.

In other cases, an owner-developer may select a head contractor based on the strength of their SOQ. This happens often on public projects that have a set budget and a guaranteed maximum price (GMP) contract.

Items Included in an RFQ

The details to include in an RFQ may vary from project to project. That said, whatever the project may be, the important thing to remember is to read the RFQ carefully, and then submit the details that the document asks for. Failure to do so could result in your tender being rejected.

Some of the most common details to include in an RFQ are:

  • List of team members who will assist with the project
  • Portfolio that demonstrates past experience with similar projects
  • Intended approach to the upcoming project, which may include details about proposed construction methods, materials, and potential obstacles
  • Health and safety history such as existing ratings, scores, and approach to quality and safety
  • Financial details such as cash flow statements and balance sheets
  • Proof of insurance such as public liability, professional indemnity, construction works insurance, and more
  • References from relevant contacts, including past owner-developers, architects, government officials, subcontractors, and other head contractors

All of the details requested by the owner-developer should go into a statement of qualifications, which the contractor then submits to the owner-developer. 

If the owner-developer approves the SOQ, the contractor can then proceed to prequalification. During prequalification, the contractor can either submit a tender or a proposal. Using tender management software can help speed up this process, making it easy to create, send, and receive tenders on one unified platform.

RFQ vs. RFI vs. RFP

While an RFQ is an important construction document, it鈥檚 far from the only one. In fact, there are so many types of requests in construction, some people use the catch-all term 鈥渞equest for X鈥 (RFX) to describe them all in one go. Despite this, there are two requests that are especially prevalent in construction: a request for proposal (RFP) and request for information (RFI).

RFQRFPRFI
MeaningRequest for QualificationsRequest for ProposalRequest for Information
PurposeGather details about a contractor鈥檚 qualifications to work on a specific projectSolicit contractor proposals about methods and costs to build a specific projectClarify information about project details, including aspects of documents like specifications, drawings or agreements.
PhasePreconstructionPreconstructionPreconstruction and Construction

During preconstruction, owner-developers use RFPs to solicit proposals from potential contractors for a specific project. The purpose of the RFP process is to select a head contractor, and then proceed to the contract negotiation and project buyout phases.

While completing a project, contractors and other project team members use RFIs to ask questions about (and clarify) issues relating to specifications, design coordination (drawings), and agreements. As an example, a contractor may issue an RFU to clarify a detail about a construction drawing, identify a potential design problem, or resolve an ambiguous detail in the specifications.

There are many other names for requests in construction, such as requests for tenders. Regardless, the purpose of these requests is to help all parties involved understand the specifics of a project, and to understand those specifics during each phase of construction. This way, everyone is on the same page about what needs to happen, including when and how it should happen. 

Categories:

Preconstruction

Tags:

Written by

Tamara Harris

Tamara has experience in a broad number of topics across construction. From her various roles in 51动漫 as a product consultant to eventually supporting larger construction companies, Tamara understands the industry and is eager to help continue to make it better.

View profile

Explore more helpful resources

article-image

Regulation vs Reality: Why Relationships Still Rule Construction Payments

In this three-part series, I sit down with Craig Dunlop, Construction Manager and 51动漫 Development Manager at Mainbrace Constructions, to unpack why payment failures are still causing major upheaval and...

article-image

Construction Manager vs. Project Manager: What鈥檚 the Difference?

Clear role delineation is key to construction project success. While both Construction Managers (CMs) and Project Managers (PMs) play vital roles in ensuring projects stay on track, they approach this...

article-image

The Role of RFPs in Australian Construction Projects

Requests for Proposals (RFPs) are a core document for construction procurement in Australia. When done correctly, they align expectations, establish clear evaluation criteria, and create accountability between owners and contractors....

article-image

Ctrl + Build: The Carbon Code – Why Embodied Emissions Are The Next Big Test For Data Centre Builders

Data centre operators are under pressure to decarbonise 鈥 and operational efficiency is no longer enough. The carbon locked into construction materials is now under the spotlight. For builders, that...

51动漫 is committed to advancing the construction industry by improving the lives of people working in construction, driving technology innovation, and building a global community of groundbreakers. Our connected global construction platform unites all stakeholders on a project with unlimited access to support and a business model designed for the construction industry.

Call us at 1800 431 456 to speak with a product expert.

Downloads

  • Privacy Notice
  • Terms of Service
  • Australia Privacy

漏 2025 51动漫